Projects

Kingston
Plastering One bedroom flat
Duration: Preparation 1 day, Plastering 1 days- 4plasterers
Area: 180m2
Background: Walls-existing plaster, Ceilings-plasterboards

Plastering Whole House, Walls and Ceilings
Plastering Whole House, Interior Rendering of New Extension
Duration: 10 days
Area: 650m2
Background: Existing plaster,Plasterboards,Blockwork
Job description:

Plastering New Blockwork by spraying machine
Duration:1day
Area: 150m2
Background: Blockwork, bricwork
Job description:
– Supply the material
– Protect the window

Plastering in Pulton Place
Duration: 6 days
Area: 220m2
Background: Existing plaster and new plasterboards
Job description:
Supply the material
Wet

Grosvenor
Duration:14 days
Area:2100m2
Background: Plasterboards only
Job description:
Installation angle/stop beads
Plastering over plasterboards
Tidy

Barnet, North London
Duration:41 days
Area:3110m2
Background: Existing plaster
Job description:
Supply the material
Float and set to area

Plastering in Cologne RD
Duration:5 days
Area:170m2
Background: Existing plaster
Job description:
Removing existing plaster where needed and fill the holes<br

Plastering and skimming Loft conversion
Plastering staircase
Duration: 2 days
Area: 80m2
Background: New plasterboards
Job description:
-Supply the material
-Plastering

Plastering large new extension
Duration: 5 days
Area: 290m2
Background: Plasterboards
Job description:
-Supply the material
-Plastering over plasterboards

Plasterboarding and Plastering two rooms
Duration: 2 days
Area: 112m2
Background: Plasterboards
Job description:
-Supply the material
-Boarding walls and ceilings
-Install