Mac Plastering Team

Kingston

Duration:
Preparation 1 day,
Plastering 1 day- 4 plasterers
Area: 180m2
Background:
Walls-existing plaster,
Ceilings-plasterboards

Job: Plastering and Skimming
– Protect the floor and windows
-Plastering over plasterboards
-Plastering over existing plaster
-Apply Grit primer to walls (Febond Blue Grit is a high-performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)
-Install angle/stop beads, and fibreglass mesh tape to ceilings
-Two coats of skim to walls and ceilings
-Tidy up

Leave a Reply

Your email address will not be published. Required fields are marked *

Call Now