Plastering Whole House, Walls and Ceilings
Internal Rendering of New Extension
Duration: 10 days
Area: 650m2
Background: Existing plaster, Plasterboards, Blockwork
Job description:
-Supply the material
-Plastering over existing plaster
-Plastering over plasterboards
-Plastering over blockwork
-Hardwall and skim where needed, Float and Set
-Apply MP75 Projection Plaster with spraying machine G4
-Install angle/stop beads, fibre mesh tape
-Two coats of skim to walls and ceilings
-Tidy up