![213_c11](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c11.jpg)
![213_c12](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c12.jpg)
![213_c9](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c9.jpg)
![213_c10](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c10.jpg)
![213_c7](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c7.jpg)
![213_c8](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c8.jpg)
![213_c4](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c4.jpg)
![213_c5](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c5.jpg)
![213_c6](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c6.jpg)
![213_c2](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c2.jpg)
![213_c3](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c3.jpg)
![213_c1](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/213_c1.jpg)
Plastering in Cologne RD
Duration: 5 days
Area: 170m2
Background: Existing plaster
Job description:
Removing existing plaster where needed and filling the holes
Install angle beads, stop beads
Use a Fibreglass mesh to prevent cracking
Plastering over existing plaster left ready for decoration
Supply the material
Tidy up