![88_17..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_17.jpg)
![88_16..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_16.jpg)
![88_15..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_15.jpg)
![88_15....](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_15-1.jpg)
![88_14](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_14.jpg)
![88_13](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_13.jpg)
![88_12..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_12.jpg)
![88_11..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_11.jpg)
![88_9..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_9.jpg)
![88_10..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_10.jpg)
![88_7..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_7.jpg)
![88_8..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_8.jpg)
![88_7....](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_7-1.jpg)
![88_5..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_5.jpg)
![88_6..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_6.jpg)
![88_4..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_4.jpg)
![88_3..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_3.jpg)
![88_1.](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_1.jpg)
![88_2..](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/88_2.jpg)
Whole House Plasterboarding and Plastering
Duration:14 days
Area:470m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Removing existing plaster where needed
-Remove wallpaper,
-Remove and replace all ceilings with new plasterboards, Partitioning.
-Dot and Dab on the extension with insulated plasterboards
-Plastering over existing plaster
-Plastering over bricks and blocks
-Plastering over plasterboards
-Internal rendering and over-boarding loft,
-Install angle beads, stop beads
-Use a Fibre glass mesh to prevent cracking
-Skimming the whole house from the top to bottom
-Painting and decorating
-Supply the material
-Tidy up