Whole House Plasterboarding and Plastering
Duration:14 days
Area:470m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Removing existing plaster where needed
-Remove wallpaper,
-Remove and replace all ceilings with new plasterboards, Partitioning.
-Dot and Dab on the extension with insulated plasterboards
-Plastering over existing plaster
-Plastering over bricks and blocks
-Plastering over plasterboards
-Internal rendering and over-boarding loft,
-Install angle beads, stop beads
-Use a Fibre glass mesh to prevent cracking
-Skimming the whole house from the top to bottom
-Painting and decorating
-Supply the material
-Tidy up