![92_22](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_22.jpg)
![92_21](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_21.jpg)
![92_20](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_20.jpg)
![92_15](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_15.jpg)
![92_13-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_13-copy.jpg)
![92_14](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_14.jpg)
![92_12-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_12-copy.jpg)
![92_10-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_10-copy.jpg)
![92_9-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_9-copy.jpg)
![92_8-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_8-copy.jpg)
![92_8.-copy](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_8.-copy.jpg)
![92_8](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_8.jpg)
![92_7_1](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_7_1.jpg)
![92_7](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_7.jpg)
![92_6](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_6.jpg)
![92_5](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_5.jpg)
![92_4](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_4.jpg)
![92_3](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_3.jpg)
![92_1 (1)](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_1-1.jpg)
![92_2](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/92_2.jpg)
Plastering Whole House, New Open Plan and Rendering Exterior
Plastering Whole House
Duration: 25 days
Area: 620m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Supply the material
-Overboard the ceilings in 9 rooms
-Plastering over existing plaster
-Plastering over brickwork
-Plastering overplasterboards
-Float and set,straighten the walls
-Remove blown plaster where needed
-Dot and dab, Float and set, two coat plastering to walls
-Install Fibre glass mesh in worse areas
-Apply grit primer (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)
-3/4 mm of skim coat to walls and ceilings
-Tidy up