Plastering Whole House, New Open Plan and Rendering Exterior

Plastering Whole House

Duration: 25 days
Area: 620m2
Background: Existing plaster, brickwork, plasterboards

Job description:

-Supply the material
-Overboard the ceilings in 9 rooms
-Plastering over existing plaster
-Plastering over brickwork
-Plastering overplasterboards
-Float and set,straighten the walls
-Remove blown plaster where needed

-Dot and dab, Float and set, two coat plastering to walls

-Install Fibre glass mesh in worse areas

-Apply grit primer (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)

-3/4 mm of skim coat to walls and ceilings
-Tidy up