![96_025-toilet-1](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_025-toilet-1.jpg)
![96_024-toilet-1.4](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_024-toilet-1.4.jpg)
![96_022-loft-3.4-jpg](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_022-loft-3.4-jpg.jpg)
![96_021-Loft-1.2](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_021-Loft-1.2.jpg)
![96_020-Loft-1.1](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_020-Loft-1.1.jpg)
![96_019-Loft-1.0](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_019-Loft-1.0.jpg)
![96_014-open-plan-3.2.-jpg](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_014-open-plan-3.2.-jpg.jpg)
![96_013-open-plan-3.0-jpg](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_013-open-plan-3.0-jpg.jpg)
![96_012-open-plan-2.1](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_012-open-plan-2.1.jpg)
![96_011-open-plan-1.1-jpg](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_011-open-plan-1.1-jpg.jpg)
![96_003-Kitchen-2.](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_003-Kitchen-2.jpg)
![96_003-Kitchen-1 (1)](https://macplasteringteam.co.uk/wp-content/uploads/2023/04/96_003-Kitchen-1-1.jpg)
Plastering Whole House
Plastering Whole House including Loft
Duration: 12 days
Area: 580m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Supply the material
-Boarding the loft and overboard the ceilings in 4 rooms
-Remowe the wallpaper in 4 rooms and staircase
-Plastering over existing plaster
-Plastering over brickwork
-Plastering overplasterboards
-Float and set in the bathroom and the kitchen, straighten the walls
-Remove blown plaster where needed
-Apply grit primer (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)
-3/4 mm of skim coat to walls and ceilings
-Painting and decorating
-Tidy up