Plastering Large Loft
Plastering of a loft for our regular client,
Duration: 3 days
Area: 160m2 with many small details that needed meticulous attention.
Background: New plasterboards
Job description :
-Supply the material
-Plastering over plasterboards
-Straighten the surface
-Inastall angle/stop beads, fibre mesh tape
-Two coat of skim to walls and ceilings
-Tidy up