Plastering Two rooms and Landing
Plastering St Philomena’s Catholic High school, two rooms and landing
Duration: 6 days
Area: 180 m2
Background: Existing plaster, brickwork
Job description:
-Removing existing plaster
-Plastering over existing plaster
-Replastering the walls in 2 rooms and landing
-Supply the material
-Float and set were required
-Two coat of skim to walls and ceilings
-Tidy up