Plastering Landing
Duration:5 days
Area: 85m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Supply the material
-Remove the lining paper, dado and picture rails
-Protect the floor
-Plastering over existing plaster
-Plastering over bricks
-Apply Fibreglass mesh to walls to prevent cracking and grit primer to ceilings
-Skim coat to walls and ceilings
-Tidy up