Plastering Whole House, Walls and Ceilings

Plastering Whole House, Interior Rendering of New Extension
Duration: 10 days
Area: 650m2
Background: Existing plaster,Plasterboards,Blockwork
Job description:
-Supply the material
-Plastering over existing plaster
-Plastering over plasterboards
-Plastering over blockwork
-Hardwall and skim where needed, Float and Set
-Apply MP75 Projection Plaster with spraying machine G4
-Inastall angle/stop beads, fibre mesh tape
-Two coat of skim to walls and ceilings
-Tidy up
Kingston

Plastering One bedroom flat
Duration: Preparation 1 day, Plastering 1 days- 4plasterers
Area: 180m2
Background: Walls-existing plaster, Ceilings-plasterboards
Job: Plastering and Skimming
– Protect the floor and windows
-Plastering over plasterboards
-Plastering over existing plaster
-Apply Grit primer to walls (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)
-Inastall angle/stop beads, fibre mesh tape to ceilings
-Two coat of skim to walls and ceilings
-Tidy up