Plasterboarding and Plastering two rooms
Plasterboarding and Plastering – Two Rooms
Project type: Plasterboarding, plastering and skimming
Area: 320 m²
Duration: 12 days
Background:
Existing plaster
Brickwork
Plasterboards
Scope of Work:
Supply and delivery of all plastering and plasterboarding materials
Overboarding of ceilings in two rooms
Plastering over existing plaster, brickwork and new plasterboards
Float and set to straighten uneven walls
Removal of blown plaster where required
Installation of fibreglass mesh in weaker areas to prevent cracking
Application of Febond Blue Grit primer to improve adhesion and surface key
3–4 mm skim coat applied to all walls for a perfectly smooth finish
Complete tidy-up after works
Result:
This project involved a full renovation of two rooms, including ceiling overboarding and complete wall preparation. Our team successfully straightened and reinforced the walls before applying a high-quality skim coat, leaving every surface smooth, strong and ready for painting or decorating.
The final result demonstrates MAC Plastering Team’s ability to combine renovation, reinforcement and flawless finishing into a professional plastering service.