Plastering One bedroom flat Duration: Preparation 1 day, Plastering 1 days- 4plasterers Area: 180m2 Background: Walls-existing plaster, Ceilings-plasterboards Job: Plastering and Skimming – Protect the floor and windows -Plastering over plasterboards -Plastering over existing plaster -Apply Grit primer to walls (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to Read more...
-
Plastering Whole House, Interior Rendering of New Extension Duration: 10 days Area: 650m2 Background: Existing plaster,Plasterboards,Blockwork Job description: -Supply the material -Plastering over existing plaster -Plastering over plasterboards -Plastering over blockwork -Hardwall and skim where needed, Float and Set -Apply MP75 Projection Plaster with spraying machine G4 -Inastall angle/stop beads, fibre mesh tape -Two coat of skim to walls and Read more...
-
Duration:1day Area: 150m2 Background: Blockwork, bricwork Job description: – Supply the material – Protect the window and doors – Plastering over brickwork – Plastering over blockwork – Plastering walls using spraying machine,Knauf- MP75 – Projection Plaster -Tidy up Read more...
-
Duration: 6 days Area: 220m2 Background: Existing plaster and new plasterboards Job description: Supply the material Wet plaster to walls Prepare the surface: fill chases, holes etc Plastering over existing plaster and new plasterboards left ready for decoration. Apply Fibreglass mesh to prevent cracks and apply grit primer for the walls (Febond Blue Grit is a high performance, plasterers grip Read more...
-
Duration:14 days Area:2100m2 Background: Plasterboards only Job description: Installation angle/stop beads Plastering over plasterboards Tidy up Read more...
-
Duration:41 days Area:3110m2 Background: Existing plaster Job description: Supply the material Float and set to area 650sq Spray plaster MP75 Internal rendering Plastering over plasterboards Tidy up Read more...
-
Duration:5 days Area:170m2 Background: Existing plaster Job description: Removing existing plaster where needed and fill the holes Install angle beads, stop beads Use a Fibre glass mesh to prevent cracking Plastering over existing plaster left redy for decoration Supply the material Tidy up Read more...
-
Plastering staircase Duration: 2 days Area: 80m2 Background: New plasterboards Job description: -Supply the material -Plastering over plasterboards -Straighten the walls and ceilings -Two coat of skim coat to walls and ceilings -Tidy up Read more...
-
Duration: 5 days Area: 290m2 Background: Plasterboards Job description: -Supply the material -Plastering over plasterboards -Straighten the walls and ceilings -Two coat of skim coat to walls and ceilings -Tidy up Read more...
-
Duration: 2 days Area: 112m2 Background: Plasterboards Job description: -Supply the material -Boarding walls and ceilings -Install Fibre glass joint mesh -Plastering over plasterboards -Tidy up Read more...
-
Duration: 12 days Area: 320m2 Background: Existing plaster, brickwork, plasterboards Job description: -Supply the material -Overboard the ceilings in 2 rooms -Plastering over existing plaster -Plastering over brickwork -Plastering overplasterboards -Float and set,straighten the walls -Remove blown plaster where needed -Install Fibre glass mesh in worse areas -Apply grit primer (Febond Blue Grit is a high performance, plasterers grip coat bonding Read more...