Apmetuma Virtuves un vannas istabas pirms montieri
Kitchen and Bathroom Plastering – Pre-Fitting Preparation
Project type: Plastering works prior to kitchen and bathroom installation
Area: 90 m²
Ilgums: 3 days
Pamatinformācija:
Esošais apmetums
Brickwork
Plasterboards
Scope of Work:
Removal of existing plaster, skirting, covings and redundant furniture
Plastering over existing plaster, brickwork and plasterboards
Float and set, including Hardwall and skim for a smooth finish
Application of fibreglass mesh to reinforce walls and prevent cracking
Overboarding the ceiling and applying a full skim coat
Final tidy-up, leaving surfaces ready for fitters
Result:
This 3-day project ensured the kitchen and bathroom areas were fully prepared for installation. By removing old finishes, reinforcing surfaces and applying a high-quality skim, our team delivered perfectly smooth and durable walls and ceilings – ready for the next stage of renovation.