Plasterboarding and Plastering two rooms
Duration: 12 days
Area: 320m2
Background: Existing plaster, brickwork, plasterboards
Job description:
-Supply the material
-Overboard the ceilings in 2 rooms
-Plastering over existing plaster
-Plastering over brickwork
-Plastering overplasterboards
-Float and set,straighten the walls
-Remove blown plaster where needed
-Install Fibre glass mesh in worse areas
-Apply grit primer (Febond Blue Grit is a high performance, plasterers grip coat bonding agent specifically designed to provide an improved key to smooth surfaces)
-3/4 mm of skim coat to walls and ceilings
-Tidy up